Development of the Tillman Site
The basic engineering
concepts were to build an attractive
"upstream" facility for
removing 95% of the water from the
sewage. At the very least this would
relieve demand from the "downstream"
main Hyperion facility at El Segundo
and forestall the necessity of building
another mainline sewage tunnel through
the Valley. At the very most it would
accomplish this and the 95% reclaimed
water would be reused. The other 5%
of the water would be used to carry
the sludge down to Hyperion where
it would be burned to generate electricity.
The Valley facility would interface
with the public through a Japanese
Garden with a theme of the peaceful,
beautiful uses of water.
«