|
|
 |
|
Development
of the Tillman Site
|
 |
The
basic engineering concepts were to build an attractive "upstream"
facility for removing 95% of the water from the sewage. At the very
least this would relieve demand from the "downstream"
main Hyperion facility at El Segundo and forestall the necessity
of building another mainline sewage tunnel through the Valley. At
the very most it would accomplish this and the 95% reclaimed water
would be reused. The other 5% of the water would be used to carry
the sludge down to Hyperion where it would be burned to generate
electricity. The Valley facility would interface with the public
through a Japanese Garden with a theme of the peaceful, beautiful
uses of water |
|
The
Japanese Garden
6100 Woodley Ave, Van Nuys, California, 91406
Tel 818 756 8166 Fax 818 756 9648
E-mail Contact
us here
|
|